Control tank of oxygen large (Capacity 3200 m3).

CHANGES REVIEWS

Version                Description of modification

Autor    Daniel Hachetr                DATE 06/2017                   1.0          document définitif

 

APPROVALS

Since

Last name and name

Date      signature

Manager engineering & operations       Ing. Lanch           06/2016

Head of deposit

Daniel Hachetr  06/2017

 

 

 

 

 

 

INDICE

A             INTRODUCTION               3

A.1         OBJECTIVE          3

A.2         SCOPE  3

A.3         SCOPE OF APPLICATION              3

A.4         RESPONSIBLE FOR COMPLIANCE WITH 3

A.5         DEFINITIONS     3

B             DEVELOPMENT GROWTH            4

B.1         PREVIOUS READING LEVEL OF THETANK              4

B.2         FINAL READING OF THE LEVEL OFTHE TANK       4

B.3         RECEPTION OUT OF SCHEDULE 4

C             ROLL OF THE SUPERVISIOR         5

C.1         CONTROL OF READING OF THE LEVELSOF THE TANK      5

D             ANNEXES            5

D.1         VALUE OF THE DIGITAL MANOMETER.  5

D.2         VALUES THAT DECLARE THEMSELVES  FOOT OF THE VOUCHER OF THESERVICE 5

E             RECORD OF CHANGES AND REVIEWS    5

 

 

 

 

 

 

 

 

 

A             INTRODUCTION

 

A.1         OBJECTIVE

 

Formalize processes that include the control of the loading of the oxygen (large tank) Praxair signature.

 

A.2         SCOPE

 

Control and accompany the control over the securitymeasures which the supplier must comply since

the run-upto the filling processuntil the end of the same, as well as, take INH2O levels before and after the load reading

 

A.3         SCOPE OF APPLICATION

 

MODEL CLINIC

 

 

A.4         RESPONSIBLE FOR COMPLIANCE WITH

 

surveillance.

occupational health and safety.

reception of goods.

maintenance

 

A.5         DEFINITIONS

 

For the purposes of the application of the procedures setout in this document, means control of the

provision of  oxygen  to the measures of security and verification ofoptimum levels of load to the correct

Supply of the oxygenthat you will use the Model Clinic for the care of their patients.

 

 

OVERVIEW

 

A.5.1     OPENING HOURS

 

The reception hours are Monday to Friday 6 am to 17 pmand Saturdays from 6 to 12 hours.

 

A.5.2     UNIT OF MEASURE (OXYGEN) OF THE BIG TANK

 

The unit of measure of the oxygen of the large tank is itcalled INH2O water column inch) each line

equals 1 inch is 25.4 mm This is calculated the height and the volume of the tankcontaining 3200 M3, that is, the maximum capacity is of 96.96 INH2O, the coefficient (for this type of oxygen) is 33,

the coefficientwill always be based on the  size of the tank and will vary depending on the type

of product that is loaded, forexample if in the same tank will be  charged Argon would beused

another coefficient

 

 

 

A.5.3     PROHIBITIONS

 

The circulation and permanence isprohibited inside the restriction areaduring the process of filling of the oxygen.

 

 

B             DEVELOPMENT GROWTH

 

 

  • ALERTNESS: Before the announcementof the arrival of the provider the personnelmust give notice to the personnel ofhygiene and safety.

 

  • HYGIENE AND SAFETY: He will be aperson in charge of sending firemenspersonnel to control that the providercompany of the service takes all the safetycollections along the whole process up tothe ending of the service.

 

  • RECEPTION OF GOODS: He will be aperson in charge of realizing the Control ofthe level of INH2O.

 

B.1         PREVIOUS READING LEVEL OF THETANK

 

  • Before proceeding to realize the load, personnel of reception of goods willhave to take reading previous to themanometer (blue color) which valuesappear digitalmente and alternate withother values like the state of the battery, the value to be taken consists of 2 digits, and under the same one there appearsits unit of measurement that isexpressed in INH2O (Inch of watercolumn).

 

B.2         FINAL READING OF THE LEVEL OFTHE TANK

 

  • On having finished the load, one willproceed to check again the level of themanometer, with both information, it willhave to determine the difference, then 33 will have to multiply the difference by thecoefficient and with it it will obtain theequivalent in M3 that the providerexpresses when it generates the remito ofthe service..

 

  • Finally one will proceed to realize thereception report.

 

B.3         RECEPTION OUT OF SCHEDULE

  • The receptions out of schedule, considered between 17 after 19 hs must beattended by personnel of maintenance, who must make to fulfill the same steps forwith the personnel of alertness and ofreception of goods.

 

  • to the following working day themaintenance personnel must do delivery ofthe voucher of load to the office ofreception of goods.

 

C             ROLL OF THE SUPERVISIOR

 

C.1         CONTROL OF READING OF THE LEVELSOF THE TANK

 

To control that the personnel takes noteof the level of the oxygen before realizingthe load and on having finished the sameone.

 

D             ANNEXES

D.1         VALUE OF THE DIGITAL MANOMETER.

 

 

 

D.2         VALUES THAT DECLARE THEMSELVES  FOOT OF THE VOUCHER OF THESERVICE

 

  • Illustrative photo of the remyth with thevalues taken the day 6/16/2016 the valueof the

Manometer,before realizing theload, was of 54,see I annex D. 1) and thelater one 92, the difference is 38, thatmultiplied by the coefficient 33 gives awhole of 1254 m3 that is the value to beinformed..

E             RECORD OF CHANGES AND REVIEWS

 

Version                Description of modification

Autor    Date

1.0          Definitive document.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *